Description
- Use scaffolding safety inserts with our ClawTag holder at all legal entry points to the scaffold providing relevant safety information alongside an inspection record.
- Should the scaffolding fail inspection the insert can be removed to display the message ‘Do Not Use This Equipment’ or replace with a prohibition insert.
Scaffolding must be inspected in the following conditions:
- Following initial erection
- Exposure to adverse weather
- Conditions that could affect its strength or stability
- Following substantial alteration (addition or subtraction)
- At regular intervals not exceeding 7 days from previous inspection.